Welding casing sections together |
Finished weld |
Drill tower, with discharge pipe |
Flushing out the drilled material |
Wider shot, with drill truck and tower on left, service truck visible on right |
A better view of the service truck |
Close-up of the impact and drill drive section of the tower |
Happy family watching the drilling |
Working |
A better view of the drill truck |
The well has been drilled and capped, but not yet plumbed |
The pump installer |
The pump motor |
The pump motor, impeller, and first section of PVC pipe (the impeller is the section with screen on it between the motor and the pipe) |
Wiring the pump |
Crimped and sealed with heat-shrink |
Wires get taped up so they don't flop around |
Fitting for outlet from well casing |